Industrial Boilers & Process Cooling Manufacturing Lines

Since 1995, BoBo has supplied finned tube and heavy bending lines to boiler and process exchanger makers. All seven mature routes are ready to quote for equipment supply only, excluding finished exchangers.

Heavy-wall serpentine steel boiler tube bundle bent by BoBo industrial tube bending machinery
Heavy-wall serpentine boiler tube
Since 1995Machinery manufacturing
7Production routes
FATWorkshop trials & witnessing

Industrial applications

Manufacturing lines built for thick-wall carbon steel, alloy steel, stainless steel, and bimetallic heat exchanger fabrication across power, refining, and process cooling.

  • Flat geometric illustration of a power plant boiler and HRSG finned tube bank heat exchanger

    Power plant boilers & HRSG

    Fabricate long-run steel finned tube banks engineered for high flue-gas loads, thermal cycling, and soot-blowing via our finned tube machinery.

    Products: H-fin tubes, boiler economizers, air preheaters & serrated fin banks.

    Lines:H-fin weldingSerrated finLaser / HF spiral
  • Flat geometric elevation cutaway of boiler waterwall tubes and serpentine superheater bundles

    Boiler waterwalls & superheaters

    Form thick-wall carbon and alloy boiler pipes into multi-bend coils with controlled ovality and repeatable angles using serpentine bending lines.

    Products: Thick-wall serpentine boiler tube bundles, superheater coils & header pipes.

    Lines:Heavy boiler bendingTube prep
  • Flat geometric cutaway of a petrochemical fired heater with studded radiant and welded convection tubes

    Petrochemical fired heaters & furnaces

    Equip refinery radiant and convection furnace sections with metallurgically bonded studs or continuous welded fins via custom fin tube lines.

    Products: Studded refinery furnace tubes & welded convection fin tubes.

    Lines:Stud weldingLaser / HF spiral
  • Flat geometric side elevation of an elevated petrochemical air-cooled heat exchanger ACHE bundle

    Petrochemical & chemical process cooling

    Manufacture steel, copper, and alloy liner tubes with locked aluminum or copper fins for high-temperature or corrosive ACHE bundles.

    Products: Air-cooled exchanger (ACHE) bundles, embedded G-fin & extruded fin tubes.

    Lines:Embedded G-finExtrudedL / Double L winding
  • Flat geometric illustration of solar thermal collectors and high-alloy shell-and-finned exchanger loops

    Nuclear, solar thermal & alloy exchangers

    Process stainless steel and heat-resistant alloy heat exchanger tubes to strict drawing tolerances and weld integrity via tube welding equipment.

    Products: Stainless & heat-resistant alloy finned tubes built to project codes.

    Lines:Laser spiral weldMechanical grooving
  • Flat geometric elevation of a plant cooling skid with aftercoolers, oil cooler block, and spiral coil

    Auxiliary plant & process cooling

    Produce reliable finned tubes and thin-wall stainless steel coils for plant compressed-air, hydraulic, generator, and industrial drying units.

    Products: Compressor aftercoolers, hydraulic oil coolers & drying coils.

    Lines:L-foot windingExtrudedThin-wall coiling

Equipment gallery

Standard finned-tube forming, bimetallic extruding, aluminum winding, and heavy boiler serpentine bending lines covering 4–76 mm base tubes, alongside five custom-engineered welded finning routes quoted directly from your tube drawings.

Finned Tube Forming, Extruding & Winding

5 standard machines covering embedded G-fin grooving, bimetallic aluminum sleeve extruding, and L / Double L tension winding. Base tube diameters start at 4 mm on the Double L winder, with finished fin OD up to 77 mm on the E-32 extruder.

  • BoBo multi-function fin tube forming machine for embedded G-type and L/KL/LL wound fins

    Multi-function finning machine

    14–50.8 mm OD8–16 mm fin height11 kW
    View specifications
  • BoBo E-50 high-capacity bimetallic fin tube extruding machine for 18-70 mm finished fin OD

    E-50 fin tube extruder

    18–70 mm fin OD15 m max. length80 / 100 rpm
    Quote E-50
  • BoBo Double L-type aluminum fin winding line for 4-50 mm round heat exchanger tubes

    Double L fin winding line

    4–50 mm OD0.35–0.6 mm strip700 rpm
    Quote Double L

Heavy Boiler & Process Coil Bending

2 dedicated bending lines spanning 32–76 mm thick-wall boiler waterwall and superheater panels (up to 8 t·m torque) as well as 9–20 mm thin-wall stainless process coils.

  • BoBo automatic thin-wall serpentine bender for thin-wall stainless steel process coils

    Automatic thin-wall serpentine bender

    9–20 mm OD0.3–1.2 mm wall35–50 mm radius
    View specifications
Five welded lines, ready to quote.H-fin · Studded · Serrated · Laser spiral · HF spiral
Request a welding quote

Production route selection

Boiler and process heat exchanger lines split into custom welded flue-gas routes (quoted from your tube drawings) and standard mechanical finning or heavy bending series.

Welded Finned & Studded Tube Lines

Custom-configured per base tube OD, fin pitch, strip gauge & steel grade
  • Technical cross-section diagram of H-fin double-H tube welding geometry
    Utility Boilers · HRSG

    H-fin tube welding line

    Weld single or double H-shaped steel plates onto thick-wall boiler tubes for high ash-load flue-gas recovery.

    Materials: Carbon steel & Cr-Mo alloy boiler tubes

    Service: Utility boilers, HRSG & flue-gas economizers

  • Technical cross-section diagram of studded tube pin resistance welding geometry
    Refinery Fired Heaters

    Studded tube welding line

    Automatically weld resistance-heated cylindrical studs onto furnace tubes at drawing-specified pitch and helix angle.

    Materials: Carbon, ferritic alloy & heat-resistant steel

    Service: Refinery fired heaters, reformers & boiler furnaces

  • Technical cross-section diagram of serrated spiral fin high-frequency welding geometry
    HRSG Convection Banks

    Serrated spiral fin welding line

    Wind and continuously weld serrated steel strip around boiler tubes to boost gas-side turbulence and fin rigidity.

    Materials: Carbon steel, stainless & ferritic alloy strip/tube

    Service: HRSG convection banks & compact waste-heat units

  • Technical cross-section diagram of solid spiral fin laser and high-frequency welding geometry
    Economizers · Waste Heat

    Spiral fin welding (Laser or HF)

    Choose fiber laser welding for precision stainless strip control, or high-frequency (HF) welding for high-speed carbon steel tonnage.

    Heat sources: Fiber laser (low HAZ) · High-frequency (HF) induction

    Service: Boiler economizers, fired heaters & HRSG coils

Mechanical Finning & Heavy Bending Routes

Matched to standard machine series in the Equipment Gallery
Cross-section comparison of L-foot wound, G-foot embedded, and bimetallic extruded finned tubes

Choosing mechanical finning vs. heavy boiler bending

Choose embedded G-fin for cyclic hot-oil or flue-gas service, bimetallic extruded aluminum sleeves for corrosive refinery/coastal ACHE, or tension-wound L / Double L fins for general utility coolers. Thick-wall boiler panels run on continuous serpentine bending lines.

RouteForming & BondReference MachinesPrimary ServiceAction
Embedded G-finGroove, insert strip & roll lockMulti-Function Finning (14–50.8 mm OD · 11 kW)Process ACHE & high-temp coolersSee machineQuote
Bimetallic extruded finCold-roll aluminum sleeveE-32 (11 kW) · E-50 (18–70 mm fin OD, 15 m)Corrosive refinery & coastal ACHESee machinesQuote
L / Double L / KL wound finTension-controlled strip foldingSpiral L-Foot Winder (40 m/h) · Double L (4–50 mm OD, 700 rpm)Utility coolers, drying & HVAC bundlesSee machinesQuote
Heavy boiler bendingContinuous CNC hydraulic serpentine32–76 mm boiler bender (3–12.7 mm wall · 8 t·m)Waterwalls, economizers & superheatersSee bendersQuote

Heavy-wall boiler line, built & tested in-house

Continuous feeding links clockwise and counterclockwise bends on thick-wall steel boiler tubes. Every line runs material trials in our Nantong workshop before delivery.

BoBo heavy-wall two-way boiler serpentine tube bending line during workshop assembly and testing
Workshop build · Two-way boiler serpentine bending line
Tube OD25–63 mm
Wall thickness3–10 mm
Max. torque5 t·m
Angle accuracy±0.1°
Request line configuration & FAT plan

      Sample Trial

      Test your base tube and fin stock for groove lock, weld bond, or bend ovality.

      Workshop FAT

      Witness dry-cycle and material test runs in Nantong, in person or via live video.

      Code Alignment

      Agree dimensional reports and CE, ASME, or ISO inspection packages per contract.

Engineering FAQ

Welded finned tube machines (H-fin, studded, serrated, laser or HF spiral) create a metallurgical bond between the steel or alloy fin and base tube, which suits high flue-gas temperatures, thermal cycling, and soot-blowing in power boilers, HRSG units, and petrochemical fired heaters. Mechanical finning machines (Multi-Function G-fin forming, E-32/E-50 bimetallic extruding, and L/Double L winding lines) pair steel, copper, or alloy liner tubes with aluminum or copper fins and are mainly used in air-cooled heat exchangers (ACHE) and industrial process coolers where corrosion protection or moderate operating temperatures apply.

Selection depends on tube diameter, wall thickness, and required bending torque. Our dedicated boiler serpentine bending line handles 32–76 mm OD and 3–12.7 mm wall thickness with 8 t·m torque (12–100 m tube lengths), while our two-way combined boiler line covers 25–63 mm OD and 3–10 mm wall thickness with 5 t·m torque (R ≥ 1.1D when wall thickness ≥ 10%D). For small, thin-wall stainless steel process coils (9–20 mm OD, 0.3–1.2 mm wall), our thin-wall automatic serpentine bender is the correct machine.

To prepare an accurate line layout and formal quote, send your tube bundle or finned tube drawing showing base tube OD, wall thickness, maximum tube length, bare-end allowances, fin pitch, and material grades, along with target output per shift. For heavy serpentine benders and long finning lines, sharing your workshop bay length and crane capacity helps our engineers plan continuous feeding tables and run-out racks.

Every boiler finned tube or bending project starts with a drawing review to confirm tooling coverage and machine configuration. Before delivery, we can arrange trial runs on your target tube material to inspect fin embedding, weld bond quality, or bend geometry, followed by in-person or live-video FAT witnessing in our Nantong facility. Applicable CE, ASME, or ISO inspection packages are scoped and agreed upon per contract.

Send your line inquiry

Tell our engineers your required route, tube OD, wall thickness, and material specs for a configuration & trial plan.

Talk To Our Expert